Thursday, March 15, 2007
The long wait is over...
We pulled a late night at the shop on Tuesday...wrenching together a bunch of team bikes. Well, let me start that over... The Get a Grip crew and our Cannondale Representative, Josh, pulled a late night wrenching on our bikes, while we sat around eating pizza, anxiously awaiting our 1st rides...we did throw some tires on a few sets of new wheels and swept up the shop. Many thanks to Kevin, Matt, Jason and Josh for the long hours and hard work they've put in not only on Tuesday night, but also just getting this team put together.
Steve's bike was the first one out of the gate, he was all grins and literally couldn't wait. We all gathered outside of the shop to watch Steve bomb up and down the street around 11pm.
And now, the finished product! (please note that I'm swapping out my old, blue tires on these training wheels for a new set of black ones. The blue clashes.)
Details, details, details....
Cannondale SI Carbon Crankset/BB (Huge, Light & STIFF)
Cannondale SI Integrated Headset with Massive Carbon Stem
Campagnolo Chorus 10sp
FSA K-Wing Bars
LOOK Keo Pedals
Selle Italia SLR Saddle
Easton Seat Post
FSA RD 400 (Training wheels)
ROLF Vector Pro Aero (Racing wheels)
Mass Wattage provided by Angelo on pasta
Labels:
belgian beer,
cannondale,
get a grip,
good times,
pizza,
system "SICK"s,
system six,
wrenching bikes
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment